You have not yet added any article to your bookmarks!
Join 10k+ people to get notified about new posts, news and tips.
Do not worry we don't spam!
Post by : Badri Ariffin
More than 900 individuals connected to 11 hydropower projects in Nepal’s Rasuwa and Nuwakot districts are currently unreachable after catastrophic floods struck the Bhote Koshi River on August 26, as reported by the Independent Power Producers’ Association of Nepal (IPPAN).
Of these, 730 individuals are linked to six hydropower projects in Rasuwa, while 204 are from five projects in Nuwakot, according to IPPAN.
The Upper Trishuli-1 Hydropower Project, with a capacity of 216 MW located in Rasuwa, has reported the largest number of uncontactable workers.
As per IPPAN, 576 individuals tied to this project are currently unreachable. This project, developed by Nepal Water and Energy Development Company (NWEDC) with support from South Korean investors, the International Finance Corporation (IFC), and local partners, is severely affected.
Another project, the 37-MW Upper Trishuli-3B in Nuwakot, has reported 158 uncontactable workers.
The 111-MW Rasuwagadhi Hydropower Project reported 93 individuals are currently unreachable.
This number stands as the third-highest among the affected hydropower projects.
According to IPPAN, the residual 107 individuals are associated with eight additional hydropower projects, some still under construction and others fully operational.
The August 26 floods have notably impacted 13 hydropower projects across the Rasuwa and Nuwakot districts, with a total installed capacity of 675.6 MW, IPPAN stated.
Additionally, significant damage has been reported at hydropower facilities and related infrastructure in both districts.
The National Disaster Risk Reduction and Management Authority (NDRRMA) has announced that 626 bodies have been recovered from the floods as of 10 a.m. on Saturday.
The authority has also noted that 2,426 individuals remain uncontactable.
The flooding was triggered by a sudden surge in the Bhote Koshi River, leading to widespread casualties and substantial damage to hydropower projects, infrastructure, roads, and bridges in the affected regions.
Tadej Pogacar Ends 2026 Season Early After Vuelta Crash
Tadej Pogacar ends his 2026 season after a Vuelta crash. The Pogacar 2026 season now focuses on reco
Panama Canal Cuts Daily Ship Crossings as El Nino Drought Deepens
Panama Canal reduces daily ship crossings as severe drought linked to El Nino lowers water levels an
Court Rejects DNAA Bid by Maju Holdings Director and Wife in Case
Kuala Lumpur court rejects DNAA bid by Maju Holdings director and wife in CBT and money laundering c
2026 F1 Singapore Grand Prix: Major Road Closures Announced
Major roads will close for the F1 Singapore Grand Prix 2026 from Oct 7 to Oct 13, with public transp
Smriti Mandhana Becomes Women's Cricket's Leading Run-Scorer
Smriti Mandhana becomes the leading women's cricket run-scorer after a record century against Hong K
France Begins Road Tests of Tesla Self-Driving Technology
France begins testing Tesla FSD on public roads as Europe considers wider approval of the technology